Building a Farm Pond in the Upstate: From Pasture to Pond in Slater-Marietta

← All posts
November 16, 2026
Three-panel progress photo of a farm pond build in Slater-Marietta, SC: a dozer clearing trees, the dug red clay basin, and the pond starting to fill with water

A farm pond can give cattle a water source, hold water for crops, or just make a piece of land more useful. But a pond is more than a hole in the ground. It has to hold water, the dam has to stay put, and in some cases the state or the Army Corps of Engineers has a say before you dig.

Here's how a farm pond comes together, using one we built this year for a farmer in Slater-Marietta as the example.

The Slater-Marietta pond

This job started as pasture, with cows grazing next to a tree line. Between March and June 2026, our crew cleared the tree line, dug and shaped the basin, and built the dam up and packed it tight. By June the pond was already filling with water.

Three-panel progress photo of a farm pond build in Slater-Marietta, SC: a dozer clearing trees, the dug red clay basin, and the pond starting to fill with water
Clearing, basin dug, and filling up on our Slater-Marietta farm pond.

The photo shows three of those stages: the dozer clearing trees, the finished basin in red clay, and the first water coming in.

Step 1: Pick the right spot

Where the pond goes matters more than anything else. The USDA Natural Resources Conservation Service (NRCS) says a pond site depends on the soil's ability to hold water. Clays and silty clays are excellent for this, and sandy or gravelly clays are usually satisfactory (NRCS Agriculture Handbook 590). That's good news on a lot of Upstate land, where red clay is common, but every site is different.

NRCS also recommends:

  • Looking at more than one possible location before you pick one
  • Doing a site survey to plan the dam, the spillway, and the pond's capacity
  • Making soil borings under the planned dam, at least one and a half times as deep as the dam will be tall
  • Removing peat, muck and high-organic soil from under the dam

For an embankment pond, NRCS says the most economical site is where you get the most storage with the least amount of earthfill (NRCS Handbook 590). NRCS field offices can also help farmers with pond planning.

Step 2: Check the rules before you dig

Two sets of rules can apply to a farm pond in South Carolina.

State dam safety. SCDES regulates a dam if it is 25 feet or taller, can hold back 50 acre-feet of water or more, or could cause loss of life if it failed, regardless of size. A regulated dam needs plans, specifications and a written permit before construction starts (SCDES). SCDES says the vast majority of dams in the state are exempt from regulation (SCDES 2025 State of the Dams), but the loss-of-life test applies regardless of size, so think about what sits downstream. If you're not sure, SCDES says to check with its Dam Safety Program.

Streams and wetlands. If the pond would put fill in a stream or wetland, federal Clean Water Act rules come into play. Section 404(f) exempts construction of farm and stock ponds from needing a permit (U.S. Army Corps of Engineers), but there are limits. The Corps' Charleston District, which covers South Carolina, says the exemption is for agricultural producers, the pond size can't exceed the farm's water needs, and a pond built for recreational, residential or other non-farm use is subject to permitting (USACE Charleston District). The same guidance says ponds for irrigation and livestock usually have at least 8 feet of water at the deepest part.

Not every pond needs a permit, but find out before you dig, not after.

Step 3: Clear the site

Trees and roots have to come out of the dam footprint and the pond area. Roots left in a dam can rot and open paths for water to seep through. On the Slater-Marietta job, clearing the tree line was the first stage. For more on clearing options, see our land clearing page.

SCDES also recommends keeping trees and brush off the entire dam after it's built: both slopes, the top, and the emergency spillway (SCDES Dam Safety Newsletter).

Step 4: Dig the basin and build the dam

This is the main earthwork. The basin is dug and shaped, and the dam is built up in layers and compacted. NRCS says the best fill for a dam is a mix of particle sizes from small gravel or coarse sand down to fine sand and clay, with about 20 percent clay by weight. A well-compacted dam made from the right material is what keeps the pond from leaking or failing.

The spillway matters just as much. NRCS calls for sizing the spillway so runoff from the design storm can pass safely, instead of going over the top of the dam. That's the part most likely to get skipped on a do-it-yourself pond.

Our grading and excavation crew handles the digging, shaping and compaction.

Step 5: Stabilize and let it fill

Once the dirt work is done, bare slopes need cover fast. Red clay on a fresh slope can wash in the first hard rain, so seed and straw or matting go down as soon as grading is finished. Our washout repair post shows what happens when slopes aren't protected.

How fast a pond fills depends on rain and the drainage area feeding it. The Slater-Marietta pond was filling by June.

Farm pond planning checklist

  • Purpose decided: livestock water, irrigation, or something else
  • More than one site looked at
  • Soils checked for water-holding clay
  • Dam height and storage estimated against the SCDES 25-foot and 50-acre-foot limits
  • What's downstream considered
  • Streams or wetlands identified, and Corps guidance checked if any will be affected
  • Spillway planned for big storms
  • Clearing plan covering the dam and pool area
  • Seed, straw or matting ready for when grading is done

Keep it working

A pond needs upkeep like anything else. Keep trees off the dam, keep the spillway clear, and watch for wet spots or erosion on the dam's downstream side. If you have an existing pond that needs work, see our stormwater pond repair page and our post on pond maintenance.

We build and repair ponds across Greenville, Spartanburg, Anderson and Pickens counties, along with the clearing and grading around them.

Ready to start? Get a Free Quote and we'll come walk your land.

Frequently asked questions

Do I need a permit to build a farm pond in South Carolina?

It depends on the pond. SCDES requires a dam safety permit if the dam is 25 feet or taller, holds 50 acre-feet or more, or could cause loss of life if it failed. If the pond affects a stream or wetland, Army Corps rules may also apply. Farm ponds can be exempt, but only under certain conditions.

What soil is best for a farm pond?

NRCS says clays and silty clays are excellent for holding water, and sandy or gravelly clays are usually satisfactory. Very sandy or gravelly soils can leak too much.

How deep should a farm pond be?

Army Corps guidance for South Carolina says ponds for irrigation and livestock usually have at least 8 feet of water at the deepest part. The right depth for your pond depends on its use and the site.

Can trees grow on a pond dam?

They shouldn't. SCDES recommends removing trees and brush from the whole dam, including both slopes, the top and the emergency spillway.